Resto-Mod of
"The Chevelle"
     
    Project In Progress (Last updated 11/23/2010)
The Teardown

SS396 (code 138) with original numbers matching drivetrain
The Body Shop
The Polishing Shop
The Engine Build
The Reassembly

Click on pictures for larger viewing

THE TEARDOWN
July 26, 2010
The Drop-Off

Dropped off at Tri-C Engineering.
"YES- Went through the gears once
or twice on the way there"

 
July 29, 2010
Engine Out, Apart & Front Clip Off

Original block 360 HP 396ci.,
modified to 427ci. (4.25" bore, 3.27" stroke)
carbs on the floor Carter 600's (Rare 409 set)

        
Looks pretty good for an engine built 30 years ago (approx 10,000 miles)
August 12, 2010

Fire Wall Components Removed,
Heater and Dash Removed
(Note mileage on odometer is at 82,976)

       
August 20, 2010

Top removed and interior
completely removed

     
August 31, 2010

Clip reattached
and aligned in prep for bodywork

     
September 14, 2010

Loaded off to the body shop
"House of Customs

   
BODY SHOP
September 24, 2010

STEP 1
Sand to Bare Metal
NO RUST ANYWHERE!

         
October 5, 2010

Step 2
First Primer - Epoxy
Now we can see what we're working with

       
October 21, 2010

Step 3
Bodywork in progress

         

         

October 27, 2010

Step 4
Bodywork has progressed to
alignment phase

     
October 30, 2010

Step 5
Bodywork complete and primered

     
November 13, 2010

Step 6
Long-Blocking has begun

 

     
January 19, 2011

Step 7
In the paint booth

         
THE POLISHING SHOP
September 10, 2010

At the polishing shop
Stripping, straightening, polishing
and clear ceramic coating

         
October 10, 2010

Windowing stripped of chrome
Note: Polished copper under chrome and
factory brass pivot

 
November 5, 2010

New parts before polishing

         
November 16, 2010

Back from The Polishing Shop

 

             
ENGINE BUILD
December 3, 2010

Engine Block Markings (Orig. to my car #07464)

4-Bolt Main Block bored to 4.25",
Forged TRW Pistons,
Edelbrock "Performer" Aluminum Heads,
Forged Cross-Drilled Crank,
COMP "Xtreme Energy" Roller Cam #11-432-8
(510 Lift, 282 Duration

     

       

REASSEMBLY
February 8, 2011
 

Returned to Tri-C Engineering.

February & March, 2011

 

 
February 8, 2011


March12, 2011

 

April, 2011

   
     
April 1, 2011

April 15, 2011

 

 

April 21, 2011

 

 

May 12, 2011

   

June 6, 2011

       

July, 2011

         
July 22, 2011

Undercar

September 12, 2011

       
           

October, 2011


October 14, 2011

   
 
October 31, 2011

 

Upholstery

November 29, 2011